Ifmira builds and maintains the lines that move product from the wellhead onward. Our crews have delivered welding scopes across multiple kilometre-post sections for Oilserve, and constructed and buried flowlines at SEPLAT wells OHS-3 and OHS-4.
We mobilise our own welding fleet, excavation plant and pipe-location equipment, which keeps schedule risk with us rather than with a chain of hired subcontractors.
What this scope includes
- Right-of-way clearing, grading and trenching
- Pipe stringing, line-up and root/fill/cap welding
- Hot and cold tie-ins to existing facilities
- Flowline burying, backfill and reinstatement
- Hydrotesting, pigging and pre-commissioning support
- Holiday detection and coating repair
- Planned and breakdown pipeline maintenance
Delivered under this service line
Pipeline Welding — KP 3+454 to KP 5+000 and KP 5+000 to KP 6+5...
Provision of welding for two crew scopes covering kilometre posts 3+454 to 5+000 and 5+000 to 6+500.
Pipeline Welding — KP 0 to KP 1+175 (Land Section)
Provision of welding for the land section of the line, kilometre post 0 to 1+175.
Flowline Construction & Burying — Well OHS-3
Construction and burying of flowlines for well OHS-3.
Flowline Construction & Burying — Well OHS-4
Construction and burying of flowlines for well OHS-4.